{"id":6271,"date":"2026-11-06T11:21:22","date_gmt":"2026-11-06T11:21:22","guid":{"rendered":"https:\/\/thecotocongroup.com\/blog\/?p=6271"},"modified":"2026-11-13T11:39:09","modified_gmt":"2026-11-13T11:39:09","slug":"nyc-energy-grade-deadline-passed-2026","status":"publish","type":"post","link":"https:\/\/thecotocongroup.com\/blog\/nyc-energy-grade-deadline-passed-2026\/","title":{"rendered":"The October 31 Energy Grade Deadline Has Passed. Here&#8217;s What NYC Owners Should Do Now"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The 2026 posting window for NYC Building Energy Efficiency Rating labels closed on <\/span><b>October 31, 2026<\/b><span style=\"font-weight: 400;\">. If your building is over 25,000 square feet, it was supposed to have its new letter grade posted near each public entrance by that date.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For many owners, the energy grade feels like a once-a-year chore: download the label, print it, tape it up, forget about it. But this year&#8217;s deadline matters more than usual, and the grade on your lobby wall says more about your building&#8217;s future costs than most people realize.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Here&#8217;s where things stand now that the deadline has passed, and what you should do next.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"First_Is_Your_2026_Label_Actually_Posted\"><\/span><b>First: Is Your 2026 Label Actually Posted?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Under Local Law 33 of 2018, as amended by Local Law 95 of 2019, covered buildings must display their annual energy grade in a conspicuous spot near every public entrance. The label became available for download in DOB NOW on October 1, and the posting window closed October 31.<\/span><\/p>\n<p>This year there was no extension.<span style=\"font-weight: 400;\"> In 2025, DOB pushed several sustainability deadlines back, including the energy grade posting window. Many owners assumed the same would happen in 2026. It didn&#8217;t. DOB stated clearly that the 2025 extensions do not apply to filing year 2026.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If your label isn&#8217;t up, your building is exposed to a DOB violation and a <\/span><b>$1,250 civil penalty<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><b>What to do today:<\/b><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Log into <a href=\"https:\/\/www.nyc.gov\/site\/buildings\/index.page\" rel=\"nofollow noopener\" target=\"_blank\">DOB NOW<\/a> and download your 2026 label.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Post it at <\/span><b>every<\/b><span style=\"font-weight: 400;\"> public entrance, not just the main lobby. Buildings with ground-floor retail, a side entrance, or a garage entrance used by the public often miss this.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Take a dated photo of each posted label for your records.<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Make sure the label stays up until it&#8217;s replaced by the 2027 label next October.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Posting late is still far better than not posting at all.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_Your_Grade_Actually_Means\"><\/span><b>What Your Grade Actually Means<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Your letter grade comes straight from the <a href=\"https:\/\/www.energystar.gov\/buildings\/benchmark\/understand-metrics\/how-score-calculated\" rel=\"nofollow noopener\" target=\"_blank\">ENERGY STAR score<\/a> generated by your Local Law 84 benchmarking submission:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><b>A<\/b><span style=\"font-weight: 400;\">: score of 85 or higher<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><b>B<\/b><span style=\"font-weight: 400;\">: 70 to 84<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><b>C<\/b><span style=\"font-weight: 400;\">: 55 to 69<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><b>D<\/b><span style=\"font-weight: 400;\">: below 55<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><b>F<\/b><span style=\"font-weight: 400;\">: the building didn&#8217;t submit benchmarking data<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><b>N<\/b><span style=\"font-weight: 400;\">: exempt or not scorable<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">An <\/span><b>F<\/b><span style=\"font-weight: 400;\"> isn&#8217;t really about efficiency. It means DOB never received your benchmarking report. If you&#8217;re looking at an F, the problem is a <a href=\"https:\/\/www.thecotocongroup.com\/nyc-local-law-84.html\">missing LL84<\/a> filing, and that same gap almost certainly affects your LL97 compliance too.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A <\/span><b>D<\/b><span style=\"font-weight: 400;\"> is the more common worry. It doesn&#8217;t trigger a fine by itself, but it&#8217;s a public signal that your building uses more energy than most comparable properties. Tenants, brokers, lenders and buyers all see it.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Why_a_Low_Grade_Is_an_Early_Warning_for_LL97\"><\/span><b>Why a Low Grade Is an Early Warning for LL97<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The energy grade and Local Law 97 are built from the same data: your building&#8217;s annual energy use. A building with a D grade isn&#8217;t automatically over its LL97 carbon cap, but low ENERGY STAR scores and high emissions intensity often go together.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the first year of LL97 reporting, 470 Article 320 properties reported emissions above their limits. Many were the same older, gas-heated, high-amenity buildings that tend to land in the C and D range on their energy labels.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If your building got a C or D this year, treat it as a prompt to run the LL97 numbers, both against today&#8217;s 2024\u20132029 limit and against the much tighter 2030 limit.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_You_Improve_Next_Years_Grade\"><\/span><b>Can You Improve Next Year&#8217;s Grade?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Yes, but timing matters.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The label you&#8217;ll post in October 2027 will be based on your <\/span><b>calendar year 2026<\/b><span style=\"font-weight: 400;\"> benchmarking data, which you&#8217;ll file by May 1, 2027. Most of 2026 is already behind us, so big efficiency projects started now mainly affect the <\/span><b>2028<\/b><span style=\"font-weight: 400;\"> label.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That doesn&#8217;t mean nothing can be done for 2027. A surprising number of poor scores come from <\/span>data problems<span style=\"font-weight: 400;\">, not building problems:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Missing utility meters (a tenant-paid electric meter, a second gas account, or district steam left out)<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Incorrect gross floor area<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Wrong property use type or missing use details (number of units, operating hours, computers, laundry)<\/span><\/li>\n<li><span style=\"font-weight: 400;\"> \u00a0 \u00a0 \u00a0 \u00a0 <\/span><span style=\"font-weight: 400;\">Gaps or estimated months in the utility data<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Cleaning up your Portfolio Manager profile before the May 2027 submission can move your score legitimately, with no construction at all. It also protects you on LL97, where DOB audits filed reports and a mismatch between your LL84 and LL97 data is a red flag.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_a_Better_Grade_Is_Worth\"><\/span><b>What a Better Grade Is Worth<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">An A or B grade is a marketing asset. A D on the wall is a conversation every prospective tenant and lender will eventually have with you. Improving the grade usually means reducing energy use, which lowers operating costs and LL97 exposure at the same time.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_Cotocon_Can_Help\"><\/span><b>How Cotocon Can Help<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The Cotocon Group handles LL84 benchmarking, energy grade downloads and posting, and <a href=\"https:\/\/www.thecotocongroup.com\/nyc-local-law-97.html\">LL97<\/a> emissions filings for buildings across all five boroughs. If your 2026 label isn&#8217;t posted, your grade is lower than expected, or you&#8217;re seeing an F and aren&#8217;t sure why, we can usually diagnose the issue quickly.<\/span><\/p>\n<p><b>Call (212) 889-6566<\/b><span style=\"font-weight: 400;\"> or contact us to review your building&#8217;s grade and benchmarking data before the May 2027 filing.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"FAQ\"><\/span><b>FAQ<br \/>\n<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><b><br \/>\nWhat is the penalty for not posting an NYC energy grade?<\/b><span style=\"font-weight: 400;\"><br \/>\nFailing to display the label can result in a DOB violation and a $1,250 penalty.<\/span><\/p>\n<p><b>Was the 2026 energy grade deadline extended?<\/b><span style=\"font-weight: 400;\"><br \/>\nNo. DOB said the 2025 deadline extensions do not apply to filing year 2026. The posting window ran October 1 to October 31, 2026.<\/span><\/p>\n<p><b>Why did my building get an F?<\/b><span style=\"font-weight: 400;\"><br \/>\nAn F means no benchmarking report was submitted for that year. It&#8217;s a filing problem, not an efficiency score.<\/span><\/p>\n<p><b>Can I change my grade after it&#8217;s issued?<\/b><span style=\"font-weight: 400;\"><br \/>\nThe grade reflects your submitted benchmarking data. If that data was wrong, correcting future submissions is the main way to improve the next label. Talk to your benchmarking provider about your options.<\/span><\/p>\n<p><b>How long does the label need to stay up?<\/b><span style=\"font-weight: 400;\"><br \/>\nUntil it is replaced by the next year&#8217;s label, issued each October.<\/span><\/p>\n<div style=\"margin-top: 0px; margin-bottom: 0px;\" class=\"sharethis-inline-share-buttons\" ><\/div>","protected":false},"excerpt":{"rendered":"<p>The 2026 posting window for NYC Building Energy Efficiency Rating labels closed on October 31, 2026. If your building is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6272,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":"","_ppma_block_editor_authors":""},"categories":[43],"tags":[],"ppma_author":[60],"class_list":["post-6271","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy-grades"],"authors":[{"term_id":60,"user_id":1,"is_guest":0,"slug":"admin","display_name":"thecotocongroup","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/6c97e8732279109c5164e538b23e3dfc13b6ecb297099577962be5c52887d138?s=96&d=mm&r=g","avatar_alt":"","avatar_decorative":"","author_category":"","first_name":"","last_name":"","user_url":"https:\/\/thecotocongroup.com\/blog","job_title":"","description":""}],"rttpg_featured_image_url":{"full":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40.webp",800,511,false],"landscape":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40.webp",800,511,false],"portraits":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40.webp",800,511,false],"thumbnail":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40-150x150.webp",150,150,true],"medium":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40-300x192.webp",300,192,true],"large":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40.webp",800,511,false],"1536x1536":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40.webp",800,511,false],"2048x2048":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/11\/Cotocon-40.webp",800,511,false]},"rttpg_author":{"display_name":"thecotocongroup","author_link":"https:\/\/thecotocongroup.com\/blog\/author\/admin\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/thecotocongroup.com\/blog\/category\/energy-grades\/\" rel=\"category tag\">Energy Grades<\/a>","rttpg_excerpt":"The 2026 posting window for NYC Building Energy Efficiency Rating labels closed on October 31, 2026. If your building is [&hellip;]","_links":{"self":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts\/6271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/comments?post=6271"}],"version-history":[{"count":1,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts\/6271\/revisions"}],"predecessor-version":[{"id":6273,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts\/6271\/revisions\/6273"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/media\/6272"}],"wp:attachment":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/media?parent=6271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/categories?post=6271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/tags?post=6271"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/ppma_author?post=6271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}