{"id":6258,"date":"2026-10-30T11:11:51","date_gmt":"2026-10-30T11:11:51","guid":{"rendered":"https:\/\/thecotocongroup.com\/blog\/?p=6258"},"modified":"2026-11-13T11:19:40","modified_gmt":"2026-11-13T11:19:40","slug":"ll87-deadline-december-31-2026-winter-energy-audit","status":"publish","type":"post","link":"https:\/\/thecotocongroup.com\/blog\/ll87-deadline-december-31-2026-winter-energy-audit\/","title":{"rendered":"LL87 Deadline Is December 31: How to Use Winter to Finish Your Energy Audit"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]<\/p>\n<h2><span class=\"ez-toc-section\" id=\"LL87_Deadline_Is_December_31_How_to_Use_Winter_to_Finish_Your_Energy_Audit\"><\/span><b>LL87 Deadline Is December 31: How to Use Winter to Finish Your Energy Audit<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">If your building is due to comply with New York City&#8217;s Local Law 87 (LL87) in 2026, December 31 is the standard year-end filing deadline for the Energy Efficiency Report (EER). The compliance year is determined by the last digit of the building&#8217;s tax block number. Buildings with a tax block number ending in 6 generally fall into the 2026 reporting cycle, subject to confirmation against the NYC Department of Buildings (DOB) Covered Buildings List and any applicable filing exceptions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Local Law 87 requires covered buildings to undergo an energy audit and retro-commissioning on a recurring 10-year cycle. These activities help building owners identify energy-saving opportunities, correct operational problems, and understand how their building systems use energy.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For owners who have not started the process, the remaining weeks of 2026 require immediate action. Winter offers a valuable opportunity to evaluate heating equipment under real operating conditions. However, a complete audit and compliant filing may not be achievable within a short period if the required technical work has not begun.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first step is to confirm your building&#8217;s compliance status, contact a qualified energy professional, and establish a realistic schedule for completing the audit, retro-commissioning, documentation, and filing.\u00a0<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_Your_Building_Due_Under_Local_Law_87_in_2026\"><\/span><b>Is Your Building Due Under Local Law 87 in 2026?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Before arranging an energy audit, building owners should confirm that their property is covered and that 2026 is the correct reporting year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Local Law 87 is part of New York City&#8217;s broader effort to improve energy efficiency in large buildings. Rather than requiring the same report every year, LL87 assigns covered properties a compliance year based on their tax block number. The requirement then generally repeats every ten years.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Which_buildings_must_comply_with_LL87\"><\/span><b>Which buildings must comply with LL87?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">According to the NYC Department of Buildings, covered properties generally include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Individual buildings exceeding 50,000 gross square feet.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Two or more buildings on the same tax lot that together exceed 100,000 gross square feet.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Two or more buildings held in condominium ownership that together exceed 100,000 gross square feet.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Coverage depends on the applicable rules and official property records. Some properties may qualify for an exception or deferral, while others may require additional review because of their ownership structure or recorded building area. &lt;Cite refs={[&#8220;turn653739search0&#8243;,&#8221;turn653739search2&#8221;]}\/&gt;<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_to_confirm_your_LL87_deadline\"><\/span><b>How to confirm your LL87 deadline<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Start by locating your property&#8217;s borough, block, and lot (BBL) information. You can usually find this information through property tax documents or NYC Department of Finance property records.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Next, check the current DOB Covered Buildings List for compliance year 2026. The list is a useful starting point for determining whether the property appears in the City&#8217;s records as a building required to comply.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Do not rely only on a property&#8217;s street address or estimated square footage. If the official record appears incorrect, contact the relevant City department to clarify the property&#8217;s status.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once coverage is confirmed, ask your compliance professional to review the building&#8217;s previous Energy Efficiency Report, if available, and determine whether the current audit and retro-commissioning requirements have been met or need to be repeated.<\/span><\/p>\n<p><b>Important:<\/b><span style=\"font-weight: 400;\"> The December 31, 2026 date should be treated as the standard deadline for the 2026 cohort, not as confirmation that every property has the same filing obligation. Owners should verify any applicable extensions, deferrals, exceptions, or updated DOB instructions before making compliance decisions.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Why_Winter_Is_an_Important_Time_for_an_LL87_Energy_Audit\"><\/span><b>Why Winter Is an Important Time for an LL87 Energy Audit<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Winter can be particularly useful for an LL87 energy audit because New York City buildings place greater demands on their heating systems during colder weather.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">An energy audit evaluates how a building consumes energy and identifies opportunities to reduce consumption without compromising occupant comfort or normal operations. Retro-commissioning takes a closer look at whether existing building systems operate as intended.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These activities serve different purposes, but they complement each other. The audit identifies potential improvements, while retro-commissioning tests equipment, controls, operating schedules, and other system functions to identify operational problems.\u00a0<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"1_Test_boilers_and_heating_equipment_under_real_operating_conditions\"><\/span><b>1. Test boilers and heating equipment under real operating conditions<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Boilers and other heating equipment may operate differently during mild weather than during a cold New York winter.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When outdoor temperatures fall, the building&#8217;s heating demand increases. This provides an opportunity to examine boiler staging, equipment sequencing, supply-water temperatures, and the way heating equipment responds to changing loads.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For example, a building may have several boilers that operate simultaneously even when fewer units could meet the demand. In another building, a control problem may cause heating equipment to cycle too frequently.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These conditions can increase fuel consumption and maintenance requirements. A qualified professional can evaluate the operating sequence and determine whether adjustments are appropriate for the building.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"2_Review_steam_and_hot-water_distribution\"><\/span><b>2. Review steam and hot-water distribution<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Heating energy can be wasted when distribution systems do not deliver heat effectively.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">During winter testing, an engineer may investigate uneven heating between floors, excessive temperatures in certain areas, slow response times, or other operational problems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In a steam-heated building, the review may include steam distribution, control valves, traps, and other relevant components. In a hot-water system, the review may include circulation, balancing, temperature settings, and pump operation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Not every heating problem has the same cause. A room that feels too cold may have a distribution issue, a control problem, or a separate building-envelope concern. The audit should identify the underlying cause before recommending a solution.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"3_Check_HVAC_schedules_and_temperature_controls\"><\/span><b>3. Check HVAC schedules and temperature controls<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Heating schedules should reflect how a building is actually occupied.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For example, an office building may have a predictable weekday schedule, while a residential building operates throughout the day and night. A building with mixed commercial and residential uses may need different operating schedules for different zones.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If heating equipment operates at full settings during unoccupied periods, energy may be consumed without providing a corresponding benefit.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A retro-commissioning professional can review temperature setpoints, occupied and unoccupied schedules, setbacks, and control sequences. Any changes should consider tenant needs, freeze protection, indoor environmental conditions, and the building&#8217;s operating requirements.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"4_Verify_sensors_and_control_sequences\"><\/span><b>4. Verify sensors and control sequences<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Building management systems depend on accurate information from sensors and properly configured controls.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A temperature sensor that reports incorrect readings can cause equipment to operate inefficiently. A poorly configured sequence may start equipment too early, maintain unnecessary heating, or prevent components from working together as intended.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Winter provides useful conditions for testing heating-related controls, but not every system can be fully evaluated through a single site visit. Some checks require trend data, functional testing, or observations across different operating conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The findings should be documented so the building owner can understand which problems were identified, what corrections are recommended, and how those corrections may affect energy consumption.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"5_Identify_building-envelope_problems\"><\/span><b>5. Identify building-envelope problems<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">An energy audit may also evaluate the building envelope, including windows, doors, insulation, and other components that influence heat loss.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cold-weather complaints can sometimes reveal air leakage or inadequate insulation. However, these issues should be evaluated alongside the heating system rather than treated as isolated equipment problems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For example, a heating system may appear undersized because a building loses more heat than expected. Improving controls alone may not solve the underlying problem.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A comprehensive energy audit helps building owners distinguish between operational improvements and larger capital projects.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Is_Included_in_an_LL87_Energy_Audit\"><\/span><b>What Is Included in an LL87 Energy Audit?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">An LL87 energy audit is more than a general inspection of a building&#8217;s energy bills. It involves a structured evaluation of energy use, existing equipment, operating conditions, and potential energy conservation measures.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The exact scope depends on the property and the applicable reporting requirements. The audit typically examines the following areas.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"HVAC_equipment_and_controls\"><\/span><b>HVAC equipment and controls<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Heating, ventilation, and air-conditioning systems can account for a substantial portion of a building&#8217;s energy consumption. The assessment may review equipment condition, control strategies, operating schedules, distribution systems, and opportunities to improve performance.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Lighting_systems\"><\/span><b>Lighting systems<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Lighting is another area where inefficient equipment or operating practices can increase electricity consumption.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The audit may identify opportunities involving lighting controls, operating schedules, and equipment upgrades. Recommended changes should reflect applicable code requirements and the building&#8217;s actual needs.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Domestic_hot_water\"><\/span><b>Domestic hot water<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Domestic hot-water systems can contribute to energy use in residential, hospitality, healthcare, and other buildings.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The assessment may examine water-heating equipment, temperature settings, distribution losses, and circulation practices where relevant.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Building_envelope\"><\/span><b>Building envelope<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">The audit may review components that affect heating and cooling demand, including windows, insulation, and air leakage.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Improvements to the building envelope can sometimes reduce energy demand, although their feasibility depends on the building&#8217;s construction, condition, and ownership constraints.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Utility_consumption_and_energy_performance\"><\/span><b>Utility consumption and energy performance<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Energy consumption data helps the audit team understand how the building uses electricity, natural gas, steam, or other fuels.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The review may compare utility usage across periods, investigate unusual patterns, and identify areas where more detailed investigation is warranted.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Energy_conservation_measures\"><\/span><b>Energy conservation measures<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">The audit should produce recommendations for energy conservation measures (ECMs). These measures may include operational adjustments, repairs, control improvements, equipment replacements, or larger capital investments.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The recommendations should help the owner compare potential costs, estimated savings, and practical implementation considerations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Importantly, an audit recommendation does not automatically mean the owner must immediately implement every suggested capital improvement. The applicable legal requirements, specific measures, and any separate obligations must be reviewed independently.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_Is_Retro-Commissioning_Under_LL87\"><\/span><b>What Is Retro-Commissioning Under LL87?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Retro-commissioning, often shortened to RCx, evaluates whether existing building systems operate efficiently and according to the building&#8217;s current requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is not the same as replacing old equipment or installing an entirely new HVAC system. In many cases, it focuses on identifying and correcting problems with existing equipment, controls, calibration, schedules, and operating sequences.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">NYC&#8217;s LL87 requirements include retro-commissioning of covered base-building systems before the Energy Efficiency Report is filed, subject to applicable exceptions. The work must be performed by or under the supervision of a qualified retro-commissioning agent in accordance with the City&#8217;s rules.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Typical activities may include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing HVAC operating schedules and temperature settings.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Checking sensor calibration.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Testing control sequences.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Evaluating relevant equipment and system operation.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Identifying deficiencies and documenting corrections.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Estimating the energy and cost savings associated with recommended measures.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Preparing the required retro-commissioning documentation.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">For example, a building may have a functioning boiler but an inefficient control sequence. The equipment itself might not require replacement. Correcting the control settings could improve operation without the expense of a major capital project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In another building, testing may identify equipment that requires repair or further investigation. The report should distinguish between completed corrections and recommended future work.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This distinction is important for building owners who need to budget for compliance while managing tenant comfort, operating costs, and other property priorities.<\/span>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_to_Complete_Your_LL87_Filing_Before_December_31_2026\"><\/span><b>How to Complete Your LL87 Filing Before December 31, 2026<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">With the end of 2026 approaching, building owners should move quickly from planning to execution. A successful filing depends on more than scheduling an engineer. The team must confirm the building&#8217;s requirements, complete the necessary technical work, prepare the documentation, and submit the Energy Efficiency Report correctly.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The following steps can help property owners and managers organize the process.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Step_1_Confirm_coverage_and_the_reporting_year\"><\/span><b>Step 1: Confirm coverage and the reporting year<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Begin by checking the building against the NYC DOB Covered Buildings List for 2026.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Confirm the property&#8217;s borough, block, and lot information, its recorded size, and its compliance status. If the property does not appear on the list but may qualify based on its size or ownership structure, seek clarification from the relevant City department.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Do not assume that a previous filing automatically satisfies the current cycle. Review the last submitted report and confirm whether the current reporting year requires a new audit and retro-commissioning process.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Step_2_Collect_previous_reports_and_building_records\"><\/span><b>Step 2: Collect previous reports and building records<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Gather the documentation that will help the audit team understand the building&#8217;s existing systems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Useful records include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Previous energy audit and retro-commissioning reports.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Utility bills and available energy consumption data.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">HVAC equipment schedules and equipment inventories.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Building management system trend logs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Existing control sequences and operating schedules.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Maintenance records and details of completed repairs.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Available building plans and technical documentation.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Records of major renovations or equipment replacements.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Organized records can reduce delays and help the engineer identify areas requiring further investigation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, previous reports should not automatically be treated as sufficient for the current cycle. Confirm that the audit and retro-commissioning work meets the applicable timing and technical requirements for the proposed filing.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Step_3_Engage_qualified_compliance_professionals\"><\/span><b>Step 3: Engage qualified compliance professionals<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Building owners should engage a qualified energy auditor and retro-commissioning professional as soon as possible.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ask the proposed team to assess the remaining scope of work before committing to a filing schedule. The team should identify the required site visits, functional tests, documentation, reporting tools, and certification responsibilities.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Request a written project schedule with specific milestones for fieldwork, draft reports, quality checks, and submission.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is also worth asking the provider to identify potential obstacles at the beginning of the project. These may include missing records, restricted equipment access, unavailable trend data, control-system problems, or the need for additional testing.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Step_4_Complete_the_site_assessment_and_functional_testing\"><\/span><b>Step 4: Complete the site assessment and functional testing<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Once the initial records review is complete, the audit team can evaluate the building&#8217;s systems and energy use.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For heating-related systems, winter is a useful time to observe equipment under actual heating demand. The team can review boiler operation, heating distribution, HVAC controls, schedules, and relevant system performance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Other equipment may require different testing conditions. The team should therefore plan fieldwork around the building&#8217;s systems and the applicable requirements rather than assuming that every audit activity can be completed during one winter visit.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Step_5_Document_findings_and_recommendations\"><\/span><b>Step 5: Document findings and recommendations<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">The technical findings must be converted into clear, usable documentation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The audit should identify energy conservation measures and provide relevant information about estimated implementation costs and energy savings. Retro-commissioning documentation should describe the systems tested, findings, corrections, and recommended measures as required.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Building owners should review the draft reports with their compliance team. Confirm that the documentation is complete, internally consistent, and prepared using the applicable NYC reporting requirements.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"Step_6_Complete_certification_and_file_the_report\"><\/span><b>Step 6: Complete certification and file the report<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">The final stage is preparing and submitting the Energy Efficiency Report in the required format.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The NYC Department of Buildings provides LL87 reporting tools, instructions, and submission guidance. The official LL87 page identifies <\/span><b>LL87@buildings.nyc.gov<\/b><span style=\"font-weight: 400;\"> for Energy Efficiency Report submissions and related filing information.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Before submitting, confirm the correct filing procedure, required certifications, supporting documents, and current instructions. Keep a copy of the submitted report and available confirmation of submission for the property&#8217;s compliance records.<\/span><\/p>\n<p><b>Do not leave filing until the last few days of December.<\/b><span style=\"font-weight: 400;\"> The project schedule should allow time to resolve documentation errors and respond to questions before the deadline.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_You_Complete_an_LL87_Energy_Audit_in_Winter\"><\/span><b>Can You Complete an LL87 Energy Audit in Winter?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Yes. Winter can be an effective period for conducting important parts of an LL87 energy audit and retro-commissioning project, especially when heating equipment needs to be evaluated under real operating conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, the feasibility of completing the entire process before December 31 depends on the property&#8217;s size, complexity, current documentation, equipment access, and how much work has already been completed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Energy audit projects are often planned well in advance. A building that has already collected its utility data and scheduled its professional team may be in a better position than a property starting from scratch in late October.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For a building that has not started, the first priority should be a rapid feasibility assessment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The compliance team should establish:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Whether the property is confirmed as due in 2026.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Whether any previous work can legitimately support the current filing.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Which audit and retro-commissioning activities remain outstanding.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Whether the necessary professionals can complete the work in time.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Whether an extension or an eligible deferral should be investigated.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">An owner should not assume that a provider can guarantee a December filing without reviewing the building and the work required.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If completing the report by December 31 is not realistic, contact a qualified compliance professional immediately to understand the available legal and administrative options.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_Happens_If_You_Miss_the_LL87_Deadline\"><\/span><b>What Happens If You Miss the LL87 Deadline?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Missing an LL87 filing deadline can expose a building owner to violations and civil penalties. It can also create additional administrative work when the owner later attempts to resolve the outstanding compliance requirement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The consequences depend on the applicable provisions, the building&#8217;s filing history, and the status of any outstanding violations.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Financial_penalties_and_compliance_costs\"><\/span><b>Financial penalties and compliance costs<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">The financial impact of a missed filing can extend beyond a single penalty.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Owners may need to pay for the required audit and retro-commissioning, prepare overdue documentation, address outstanding violations, and manage additional professional or administrative costs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The figures of $3,000 for the first year after the deadline and $5,000 for each subsequent year appear in some LL87 penalty summaries. However, these amounts should be verified against the current NYC code and DOB guidance before publication or use in a specific compliance decision.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Building owners should not rely on a general penalty summary to calculate their individual exposure.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Additional_administrative_work\"><\/span><b>Additional administrative work<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">An overdue report may require coordination between the property owner, the audit team, the retro-commissioning agent, and the City.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If the report is incomplete or the building has outstanding penalties, the filing process may face further complications. DOB guidance has also stated that Energy Efficiency Reports will not be accepted when applicable penalties remain outstanding. Owners should check the current status of any violations before attempting to file.\u00a0<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"What_if_you_have_already_missed_the_deadline\"><\/span><b>What if you have already missed the deadline?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">If your building is overdue, take the following steps:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm the property&#8217;s current LL87 compliance status.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Review any notices or violations associated with the building.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Contact a qualified LL87 compliance professional.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Determine which audit, retro-commissioning, or reporting activities remain outstanding.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ask the professional to review the current process for submitting overdue reports and resolving penalties.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Ignoring the issue will not complete the compliance requirement. Early action can help the owner understand the available options and organize the remaining work.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"LL87_Extensions_and_Deferrals_What_Building_Owners_Should_Know\"><\/span><b>LL87 Extensions and Deferrals: What Building Owners Should Know<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">An extension and a deferral are not the same thing. Owners should understand the difference before deciding how to proceed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The NYC Department of Buildings provides an <\/span><b>EER2 application for an extension to file an Energy Efficiency Report<\/b><span style=\"font-weight: 400;\">. The official guidance directs applicants to complete and sign the form, scan it, and email it to<\/span><span style=\"font-weight: 400;\"> LL87@buildings.nyc.gov<\/span><span style=\"font-weight: 400;\">. DOB then provides further instructions regarding receipt and payment.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A deferral is a separate option available to eligible buildings that can demonstrate compliance with the applicable New York City Energy Conservation Code requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">DOB identifies qualifying circumstances that may include certain newer buildings with compliant base-building systems and buildings that have undergone qualifying substantial rehabilitation. An EER1 application and supporting documentation are required.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Owners should verify eligibility and the applicable deadline directly with DOB. An extension or deferral should never be assumed to be approved simply because an application has been prepared or sent.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_LL87_Supports_Local_Law_97_Compliance\"><\/span><b>How LL87 Supports Local Law 97 Compliance<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Local Law 87 and Local Law 97 address different aspects of building performance, but their requirements can complement each other.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">LL87 focuses on periodic energy audits, retro-commissioning, and reporting. LL97 establishes greenhouse gas emissions limits for covered buildings and creates a separate framework for emissions compliance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The information collected during an LL87 audit can help building owners understand where energy is being consumed and which operational improvements may be worth prioritizing.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"How_retro-commissioning_can_help_reduce_emissions\"><\/span><b>How retro-commissioning can help reduce emissions<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Consider a commercial building with heating equipment that operates outside occupied hours. Adjusting the operating schedule may reduce unnecessary fuel consumption.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Similarly, correcting control sequences, improving system coordination, or addressing heating distribution problems may reduce energy waste.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Where these measures reduce the consumption of fossil fuels or electricity, they may also help lower the building&#8217;s associated greenhouse gas emissions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, <\/span><b>LL87 compliance does not automatically mean LL97 compliance<\/b><span style=\"font-weight: 400;\">. The emissions impact depends on the building&#8217;s energy use, fuel mix, applicable emissions factors, and the specific improvements implemented.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Building owners should evaluate LL97 obligations separately and use the findings from LL87 as one input into their wider energy and emissions strategy.\u00a0<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Use_audit_findings_to_plan_future_capital_investments\"><\/span><b>Use audit findings to plan future capital investments<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">An LL87 audit can help owners organize improvements into practical categories.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some measures may involve low-cost operational adjustments. Others may require equipment repairs, control upgrades, or larger capital investments.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Comparing estimated costs, expected savings, equipment condition, and emissions implications can help owners establish a phased improvement plan.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This approach is especially useful for properties that need to balance compliance obligations with operating budgets, tenant requirements, and long-term capital planning.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Common_LL87_Compliance_Mistakes_to_Avoid\"><\/span><b>Common LL87 Compliance Mistakes to Avoid<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Even experienced building owners can encounter delays when audit preparation and reporting are not coordinated.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Waiting_until_December_to_engage_an_auditor\"><\/span><b>Waiting until December to engage an auditor<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Late planning reduces the time available for site visits, technical testing, report preparation, and corrections.<\/span><\/p>\n<p><b>Better approach:<\/b><span style=\"font-weight: 400;\"> Confirm the compliance year early and establish a realistic schedule with the professional team.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Assuming_that_an_energy_audit_alone_is_sufficient\"><\/span><b>Assuming that an energy audit alone is sufficient<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">LL87 generally requires both an energy audit and retro-commissioning, unless a qualifying exception applies.<\/span><\/p>\n<p><b>Better approach:<\/b><span style=\"font-weight: 400;\"> Confirm that both components are addressed and that the Energy Efficiency Report includes the required documentation.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Using_outdated_building_information\"><\/span><b>Using outdated building information<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Old equipment schedules, incomplete utility records, and missing control-system documentation can make the audit more difficult.<\/span><\/p>\n<p><b>Better approach:<\/b><span style=\"font-weight: 400;\"> Collect current records before fieldwork begins and identify missing information as early as possible.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Treating_every_recommendation_as_a_mandatory_immediate_upgrade\"><\/span><b>Treating every recommendation as a mandatory immediate upgrade<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">An energy audit may identify several potential improvements, but not every recommended capital investment automatically becomes an immediate legal requirement.<\/span><\/p>\n<p><b>Better approach:<\/b><span style=\"font-weight: 400;\"> Separate required compliance activities from recommended improvements and review any additional legal obligations independently.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Assuming_that_filing_an_extension_guarantees_extra_time\"><\/span><b>Assuming that filing an extension guarantees extra time<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Submitting an application is not the same as receiving approval.<\/span><\/p>\n<p><b>Better approach:<\/b><span style=\"font-weight: 400;\"> Follow the official application process, retain correspondence, and confirm the application&#8217;s status and any conditions imposed by DOB.<\/span><\/p>\n<h4><span class=\"ez-toc-section\" id=\"Ignoring_the_connection_with_LL97\"><\/span><b>Ignoring the connection with LL97<\/b><span class=\"ez-toc-section-end\"><\/span><\/h4>\n<p><span style=\"font-weight: 400;\">Operational inefficiencies identified during LL87 work may also affect emissions performance.<\/span><\/p>\n<p><b>Better approach:<\/b><span style=\"font-weight: 400;\"> Coordinate energy audit findings with the building&#8217;s broader energy management and LL97 compliance planning.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"How_The_Cotocon_Group_Can_Help_With_LL87_Compliance\"><\/span><b>How The Cotocon Group Can Help With LL87 Compliance<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Preparing an Energy Efficiency Report requires careful coordination between building management, qualified technical professionals, and the applicable City reporting process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Cotocon Group helps NYC building owners and property managers understand their building compliance obligations and plan the work required to address them.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For buildings due in 2026, an early review can help establish which activities remain outstanding and what steps should be prioritized before the filing deadline.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Depending on the property&#8217;s circumstances, the compliance process may involve:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing the building&#8217;s LL87 reporting year and coverage status.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Coordinating energy audit and retro-commissioning requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Organizing building records and energy consumption information.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Identifying operational issues and potential energy conservation measures.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Reviewing documentation and filing requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Assessing applicable extension or deferral options with the appropriate professionals.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Coordinating LL87 findings with broader NYC energy and emissions compliance planning.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Every building has different systems, operating conditions, and documentation needs. The appropriate next step is to evaluate the property before setting a compliance schedule.<\/span><\/p>\n<p><b>Facing the December 31, 2026 LL87 deadline?<\/b><span style=\"font-weight: 400;\"> Contact The Cotocon Group to discuss your building&#8217;s compliance status, remaining audit requirements, and the steps needed to prepare for filing.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions_About_the_LL87_Deadline_2026\"><\/span><b>Frequently Asked Questions About the LL87 Deadline 2026<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h5><span class=\"ez-toc-section\" id=\"1_What_is_the_LL87_deadline_for_2026\"><\/span><b>1. What is the LL87 deadline for 2026?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">The standard filing deadline for buildings assigned to the 2026 LL87 compliance year is December 31, 2026. The compliance year is generally determined by the last digit of the property&#8217;s tax block number. Owners should verify their building&#8217;s status against the current DOB Covered Buildings List and confirm whether any applicable exception, extension, or deferral changes their requirements.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"2_Which_buildings_must_comply_with_Local_Law_87\"><\/span><b>2. Which buildings must comply with Local Law 87?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">LL87 generally covers individual buildings exceeding 50,000 gross square feet, certain groups of buildings on a single tax lot that together exceed 100,000 gross square feet, and certain condominium buildings that collectively exceed 100,000 gross square feet. Coverage should be verified against current City records and the applicable rules.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"3_Can_I_complete_an_LL87_energy_audit_in_winter\"><\/span><b>3. Can I complete an LL87 energy audit in winter?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Yes. Winter is particularly useful for evaluating heating systems under actual operating conditions. Boiler sequencing, steam and hot-water distribution, temperature controls, and heating schedules can be examined during periods of heating demand. However, whether the entire audit, retro-commissioning process, and report can be completed before the deadline depends on the building and the work remaining.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"4_What_is_the_difference_between_an_LL87_energy_audit_and_retro-commissioning\"><\/span><b>4. What is the difference between an LL87 energy audit and retro-commissioning?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">An energy audit evaluates how a building uses energy and identifies opportunities for improvement. Retro-commissioning tests and evaluates existing building systems to determine whether they operate efficiently and according to current building requirements. Both are generally part of the LL87 compliance process for covered buildings, subject to applicable exceptions.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"5_What_information_should_I_prepare_before_an_LL87_audit\"><\/span><b>5. What information should I prepare before an LL87 audit?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Owners should gather previous energy audit reports, retro-commissioning documentation, utility bills, equipment schedules, building management system trend logs, control sequences, maintenance records, and available building plans. The audit team may request additional information depending on the building&#8217;s systems and reporting requirements.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"6_What_happens_if_I_miss_the_LL87_filing_deadline\"><\/span><b>6. What happens if I miss the LL87 filing deadline?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Missing the deadline can result in a violation and civil penalties. The owner may also need to complete outstanding technical work, prepare the report, and resolve any applicable penalties. Contact DOB or a qualified compliance professional to confirm the building&#8217;s status and the correct process for resolving the issue.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"7_Can_I_apply_for_an_extension_under_Local_Law_87\"><\/span><b>7. Can I apply for an extension under Local Law 87?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">DOB provides an EER2 application for an extension to file an Energy Efficiency Report. Owners should follow the official instructions, submit the required documentation, and confirm the status of their application. Do not assume an extension has been approved until the relevant requirements have been satisfied.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"8_Can_a_building_defer_its_LL87_filing\"><\/span><b>8. Can a building defer its LL87 filing?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">Some buildings may qualify for a deferral if they can demonstrate compliance with applicable New York City Energy Conservation Code requirements. Eligibility depends on the building&#8217;s circumstances and supporting documentation. Owners should consult the current DOB guidance before relying on a deferral.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"9_Does_completing_LL87_automatically_satisfy_LL97\"><\/span><b>9. Does completing LL87 automatically satisfy LL97?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">No. LL87 and LL97 have different requirements. An LL87 audit can help identify energy-saving opportunities that may also reduce emissions, but the building must independently assess and meet its applicable LL97 obligations.<\/span><\/p>\n<h5><span class=\"ez-toc-section\" id=\"10_Does_LL87_require_owners_to_implement_every_energy-saving_recommendation\"><\/span><b>10. Does LL87 require owners to implement every energy-saving recommendation?<\/b><span class=\"ez-toc-section-end\"><\/span><\/h5>\n<p><span style=\"font-weight: 400;\">An energy audit identifies energy conservation measures and evaluates their potential benefits. Not every recommended capital improvement automatically has to be implemented immediately under LL87. Owners should distinguish between the report&#8217;s recommendations, the mandatory audit and retro-commissioning requirements, and any separate obligations imposed by other laws.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Final_Takeaway_Start_Your_LL87_Compliance_Review_Now\"><\/span><b>Final Takeaway: Start Your LL87 Compliance Review Now<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The December 31, 2026 deadline makes timely planning essential for NYC building owners whose properties are due under Local Law 87.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Winter provides a useful opportunity to examine heating systems under real operating conditions and identify operational improvements. However, an effective compliance plan must also account for the building&#8217;s coverage status, technical requirements, documentation, certification, and filing schedule.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Start by confirming your building&#8217;s reporting year, reviewing previous audit records, and contacting a qualified compliance professional. If you have not begun the process, establish a realistic timeline immediately and investigate any applicable extension or deferral options.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Taking action now can help you understand your remaining obligations, reduce avoidable delays, and use the audit findings to support better energy management and longer-term building performance.<\/span>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<div style=\"margin-top: 0px; margin-bottom: 0px;\" class=\"sharethis-inline-share-buttons\" ><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] LL87 Deadline Is December 31: How to Use Winter to Finish Your Energy Audit If your building is due [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6260,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"left-sidebar","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":"","_ppma_block_editor_authors":""},"categories":[25],"tags":[],"ppma_author":[60],"class_list":["post-6258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nyc-local-law-87"],"authors":[{"term_id":60,"user_id":1,"is_guest":0,"slug":"admin","display_name":"thecotocongroup","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/6c97e8732279109c5164e538b23e3dfc13b6ecb297099577962be5c52887d138?s=96&d=mm&r=g","avatar_alt":"","avatar_decorative":"","author_category":"","first_name":"","last_name":"","user_url":"https:\/\/thecotocongroup.com\/blog","job_title":"","description":""}],"rttpg_featured_image_url":{"full":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39.webp",800,511,false],"landscape":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39.webp",800,511,false],"portraits":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39.webp",800,511,false],"thumbnail":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39-150x150.webp",150,150,true],"medium":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39-300x192.webp",300,192,true],"large":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39.webp",800,511,false],"1536x1536":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39.webp",800,511,false],"2048x2048":["https:\/\/thecotocongroup.com\/blog\/wp-content\/uploads\/2026\/10\/Cotocon-39.webp",800,511,false]},"rttpg_author":{"display_name":"thecotocongroup","author_link":"https:\/\/thecotocongroup.com\/blog\/author\/admin\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/thecotocongroup.com\/blog\/category\/nyc-local-law-87\/\" rel=\"category tag\">NYC Local Law 87<\/a>","rttpg_excerpt":"[vc_row][vc_column][vc_column_text] LL87 Deadline Is December 31: How to Use Winter to Finish Your Energy Audit If your building is due [&hellip;]","_links":{"self":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts\/6258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/comments?post=6258"}],"version-history":[{"count":3,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts\/6258\/revisions"}],"predecessor-version":[{"id":6270,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/posts\/6258\/revisions\/6270"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/media\/6260"}],"wp:attachment":[{"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/media?parent=6258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/categories?post=6258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/tags?post=6258"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/thecotocongroup.com\/blog\/wp-json\/wp\/v2\/ppma_author?post=6258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}